An independent information and reference site
Sector Status

Radioactive Minerals Status

Mongolia's uranium resources, deposits and the progress of the projects. The figures come from the Mongolian national report in the 2026 edition of the Red Book, published jointly by the OECD Nuclear Energy Agency and the IAEA.

Date of the figures. All resource figures in the Red Book are as of 1 January 2025. The report was published in September 2026, but its data stops at that date.

Uranium resources

Recoverable identified resources
144,620 tU
Reasonably assured 66 234 tU + inferred 78 386 tU
In situ identified resources
192,241 tU
Total resources before mining and milling losses
Prognosticated resources
13,300 tU
Undiscovered resources
Speculative resources
1,030,000 tU
The widest category, based on geological inference. About 290 000 tU lower than in the previous report

All identified resources fall in the category recoverable at under USD 130 per kilogram. Of these, 16 883 tU are recoverable at under USD 80 per kilogram by acid in situ leaching. No unconventional resources (from phosphorite, coal and the like) have been identified.

Planned production centres and deposits

Production centreDepositDeposit typeIn situ resources (tU)Grade (% U)Mining method
Emeelt minesGurvanbulagVolcanic-related13,0580.152Underground
GurvansaikhanKharaatSandstone7,2880.026ISL
KhairkhanSandstone8,4070.071ISL
UlziitSandstone3,0760.036ISL
GurvansaikhanSandstone4,2500.034ISL
Badrakh EnergyDulaan UulSandstone11,8960.022ISL
Zuuvch-OvooSandstone93,2910.022ISL

Badrakh Energy plans to begin commercial production in 2030, with a capacity of 2 500 tU a year at Zuuvch-Ovoo and 500 tU at Dulaan Uul. Gurvansaikhan is “planned” and Emeelt mines “prospective”, with no date for first production set. Processing is planned as acid leaching with ion exchange (IX) in every case.

Timeline

  1. 1945–1960
    First phase of exploration

    After the Second World War the search for uranium in other deposits began, and many uranium occurrences were found in the brown-coal deposits of eastern Mongolia.

  2. 1970–1990
    Joint Soviet-Mongolian exploration

    Under a bilateral agreement, an expedition of the Soviet Ministry of Geology identified 1 600 radioactive anomalies and hundreds of occurrences, with 2 684 000 m of drilling, 3 179 000 m³ of trenching and 20 800 m of underground exploration workings in all.

  3. 1988
    The Dornod open pit comes into production

    The Russian-Mongolian joint venture Erdes began mining in the Mardai Gol district. The feasibility study planned 2 300 tU a year, based on 40 279 tU of resources in the Dornod and Gurvanbulag deposits at an average grade of 0.17% U. Mongolia had no mill, so the ore was carried 484 km by rail to the Priargunsky plant at Krasnokamensk in Russia for processing.

  4. 1993–2001
    Resource assessment with the IAEA

    The state-owned enterprise Uran and the IAEA assessed Mongolia's uranium resource potential in two phases.

  5. 1995
    Erdes stops mining

    Mining stopped with low uranium prices and the political and economic changes in Mongolia and neighbouring Russia. Erdes had produced 535 tU in 1989-1995. No uranium has been mined in Mongolia since.

  6. 1998–2012
    Exploration by Gurvansaikhan LLC

    Exploration of the Kharaat, Khairkhan, Ulziit and Gurvansaikhan deposits in Dundgovi province; the Minerals Professional Council accepted resources of 23 021 tU.

  7. 2019–2020
    Badrakh Energy: exploration of Zuuvch-Ovoo and Dulaan Uul

    Major exploration and development work in Dornogovi province raised the resources of Zuuvch-Ovoo to 93 291 tU; the technical report was submitted to the Minerals Professional Council in February 2020.

  8. 2021
    ISL pilot production begins

    Pilot production started on the northern field once every permit, including the detailed environmental impact assessment and the management plan, had been obtained.

  9. 10 August 2021
    The first kilogram of uranium concentrate

    Pilot production yielded its first kilogram of uranium concentrate. The wells of the northern and southern fields ran until December 2022, establishing the main technical and economic parameters of future operation. The 2020-2023 pilot tests produced 7.91 tU from Zuuvch-Ovoo and 2.53 tU from Dulaan Uul.

  10. 2022
    Gurvansaikhan LLC resumes work

    A further 40 662 m of exploration drilling, and the start of a technical report to confirm the resources to the JORC standard. Exploration expenditure jumped to MNT 13 208 million that year, from 209 million in 2021.

  11. January 2025
    Updated feasibility study of Zuuvch-Ovoo and Dulaan Uul approved

    The Minerals Professional Council approved the feasibility study updated with the pilot test results. As of 1 January 2025 the feasibility studies of eight deposits had been approved.

  12. 9 January 2025
    Parliament resolution on replacing the state's share in strategic deposits

    Resolution No. 01 “On replacing the state's share in mineral deposits of strategic importance”. The Commission's decisions later that year cite it as their basis.

  13. 17 January 2025
    Investment Agreement signed with Orano Mining

    The Government of Mongolia signed an Investment Agreement with Orano Mining, the investor in the Badrakh Energy joint venture. Commercial production is planned to begin in 2030 at 2 500 tU a year.

  14. 19 August 2025
    Conversion of Mon-Atom's shares approved

    NEC resolution No. 03 approves converting the 34% of ordinary shares held by Mon-Atom LLC into 10% of preference shares, under the terms of the Investment Agreement, once the shareholder loan granted to Badrakh Energy LLC by Orano Mining has been converted into equity.

  15. 9 September 2025
    Transfer of Areva Mongol's shares approved

    NEC resolution No. 05 approves a decision on transferring the shares of Areva Mongol LLC, holder of 66% of Badrakh Energy LLC, to Orano Mining Expansion S.A.S., a subsidiary of the Orano group registered in France.

  16. 3 October 2025
    The share transfer is ratified

    NEC resolution No. 06 ratifies the resolution of the extraordinary shareholders' meeting of 10 September 2025 approving the transfer.

  17. 3 October 2025
    The debt-for-equity decision is not ratified

    NEC resolution No. 07 declines to ratify the resolution of Badrakh Energy LLC's shareholders' meeting of 11 September 2025: it was taken without the approval required by article 7.1 of the Nuclear Energy Law, and the increase in equity by converting debt into shares had no legal basis.

  18. 3 October 2025
    Direction to identify new exploration areas

    NEC resolution No. 08 directs the NEC Secretariat, the Mineral Resources and Petroleum Authority, the National Geological Survey and Mon-Atom LLC to identify, among areas whose licences have expired, been revoked or been returned and areas registered on the cadastral map as “nuclear energy areas”, those suitable for exploring and mining radioactive minerals. Implementation is to be reported to the Commission in the first quarter of 2026.

Ownership of uranium deposits and the state's share

The Red Book describes the ownership structure of Mongolia's uranium sector by article 5 of the Nuclear Energy Law:

Quoted in the original Mongolian, which is the official text; the summaries around them are in English.

  • 5.1

    Монгол Улсын газрын хэвлийд оршиж байгаа цацраг идэвхт ашигт малтмал төрийн өмч мөн.

  • 5.2

    Улсын төсвийн хөрөнгөөр хайгуул хийж нөөцийг нь тогтоосон цацраг идэвхт ашигт малтмалын ордыг бусадтай хамтран ашиглах тохиолдолд түүнтэй хамтран байгуулах компанийн хувьцааны 51-ээс доошгүй хувийг төр үнэ төлбөргүй, шууд эзэмшинэ.

  • 5.3

    Улсын төсвийн хөрөнгийн оролцоогүйгээр хайгуул хийж нөөцийг нь тогтоон улсын нэгдсэн бүртгэлд бүртгэсэн орд газарт цацраг идэвхт ашигт малтмалын ашиглалтын тусгай зөвшөөрөл эзэмшигч компанийн хувьцааны 34-өөс доошгүй хувийг төр үнэ төлбөргүй, шууд эзэмшинэ.

  • 5.4

    Энэ хуулийн 5.2, 5.3-т зааснаас илүү хувиар төр хувьцаа эзэмших тохиолдолд уг хувийг төрөөс оруулсан буюу оруулах хөрөнгө оруулалтын хэмжээг харгалзан Засгийн газрын өргөн мэдүүлснээр Улсын Их Хурал тогтооно.

  • 5.5

    Энэ хуулийн 5.2, 5.3-т заасан төрийн эзэмшлийн хувь, хэмжээг ашигт малтмалын нөөц ашигласны тусгай төлбөрөөр орлуулах, бүтээгдэхүүн хуваах, төрийн эзэмшлийн хувьцааны төрлийг өөрчлөх, эдгээрийг хослуулах зэрэг үр өгөөжийн дийлэнх нь Монгол Улсад ногдох хувилбарыг харгалзан Засгийн газрын өргөн мэдүүлснээр Улсын Их Хурал өөрөөр тогтоож болно.

Ownership of Badrakh Energy LLC

Badrakh Energy LLC, which is developing the Zuuvch-Ovoo and Dulaan Uul deposits, is owned 66% by Areva Mongol LLC and 34% by the state-owned Mon-Atom LLC.

In 2025 the Nuclear Energy Commission took several decisions on this structure: it approved, and then ratified, the transfer of Areva Mongol's shares to a subsidiary of the French Orano group, and approved, under the terms of the Investment Agreement, the conversion of Mon-Atom's 34% of ordinary shares into 10% of preference shares. The decision of the company's meeting of 11 September 2025 to increase equity by converting debt into shares, however, the Commission did not ratify.

Source: NEC resolutions No. 03, 05, 06 and 07 of 2025. The final outcome of the share conversion and transfer still has to be confirmed separately.

Exploration expenditure and drilling

Indicator202220232024
Private exploration and development expenditure (MNT million)13,2089,18013,800
State investment (MNT million)000
Exploration drilling (m)40,66200

Uranium metallogenic provinces

Mongolia's territory is divided into four uranium metallogenic provinces: Mongol-Priargun, Gobi-Tamsag, Khentii-Daur and Northern Mongolia. Together they hold 13 uranium deposits, about 100 occurrences, and 1 400 minor occurrences and radioactive anomalies.

The Mongol-Priargun province includes the Dornod ore field of North Choibalsan, with the Dornod, Gurvanbulag, Mardain Gol, Nemer and Ulaan deposits. The Choir and Gurvansaikhan basins of the Dornod and Central Gobi hold deposits such as Kharaat and Khairkhan.

Relevant clauses of the policy

Quoted in the original Mongolian, which is the official text; the summaries around them are in English.

  • 3.1.4

    Цацраг идэвхт ашигт малтмал нь Монгол Улсын үндэсний аюулгүй байдал, эдийн засагт онцгой ач холбогдолтойг харгалзан цацраг идэвхт ашигт малтмалын ордыг хэмжээнээс нь үл хамааран стратегийн ач холбогдол бүхий ашигт малтмалын ордод хамааруулна.

  • 3.2.1

    Цацраг идэвхт ашигт малтмалын хүдрийг олборлох, боловсруулах, баяжуулах, цаашид цөмийн түлшний үйлдвэр байгуулах бодлогыг үе шаттайгаар хэрэгжүүлнэ.

  • 3.2.5

    Цацраг идэвхт ашигт малтмалыг хүдэр хэлбэрээр экспортлохгүй байх бодлого баримтална.

  • 3.2.6

    Цацраг идэвхт ашигт малтмалаас гаргаж авсан бүтээгдэхүүнийг Монгол Улсын болон олон улсын гэрээнд нийцүүлэн гагцхүү энхийн зориулалтаар экспортлоно.

Annex to Parliament resolution No. 45 of 2009. Full text in the legal library and on legalinfo.mn.

Source: OECD NEA and IAEA, Uranium 2026: Resources, Production and Demand (NEA No. 7770, OECD 2026), national report of Mongolia. Data as of 1 January 2025. See the link for the official text.